Step 1. We start the installation of the open cell ceiling by determining its level using a laser level and drawing it on the walls. The distance from the suspended ceiling to the main one must be at least 150 mm.
Step 2. Wall angle bracket is mounted at the perimeter. It is mounted on dowels, the distance between the dowels is 300-500 mm.
Step 3. Lines of the bearing profiles course and the points
of fixing the racks are marked on the ceiling. The racks are mounted on
dowels previously embedded in the ceiling with a step of 800-1000 mm.
Racks
closest to the wall should be fixed at a distance of not more than 600 mm
from the wall. The suspension consists of an expansion spring and two rods
(with a hook and an eyelet) or a rod and a system rack.
Step 4. Bearing profile are attached to the racks, and when
connected with perpendicular crossbars, they form a grid - the structure of
the open cell ceiling.
Bearing profiles are connected with each other
using connectors.
Step 5. On a flat, clean surface, collect the upper profile
and the lower profile of the ceiling into a raster.
Mount open cell
ceiling panels from the top to the prepared and properly leveled grid.
Bottom profiles in the panel must be parallel to the 2400 mm long bearing
profile.